Fox Valley

We're building better banking for the Fox Valley! 

We are building for the future and can't wait for you to see our new 23,986-square-foot banking center at 3740 Investors Court in Grand Chute! The new facility will replace our current Fox Valley branch, located at 5643 Waterford Lane, and is scheduled to open in fall of 2021.

The new building will offer:

  • Easy access for customers
  • Skylight
  • Open staircase
  • Beverage stations
  • Antique vault door
  • Fireplace
  • Two drive-thru lanes

More Information

March 29, 2021 Front Entrance
March 29, 2021 Front Entrance
March 29, 2021 Interior Office and Doorway
March 29, 2021 Interior Office and Doorway
March 29, 2021 Interior Studs on First Floor
March 29, 2021 Interior Studs on First Floor
March 29, 2021 Staircase
March 29, 2021 Staircase
February 17, 2021 Install of Zip Boards and Temp Windows
February 17, 2021 Install of Zip Boards and Temp Windows
February 17, 2021 Ground Thaw Heating Blanket
February 17, 2021 Ground Thaw Heating Blanket
February 17, 2021 Detail Work
February 17, 2021 Detail Work
February 17, 2021 Install of Zip Boards and Temp Windows East
February 17, 2021 Install of Zip Boards and Temp Windows East
January 26, 2021 South Frame and Skylight
January 26, 2021 South Frame and Skylight
January 26, 2021 West Frame
January 26, 2021 West Frame
January 26, 2021 Southeast Frame and Windows
January 26, 2021 Southeast Frame and Windows
December 16, 2020 South
December 16, 2020 South
December 16, 2020 West View Structural Steel
December 16, 2020 West View Structural Steel
December 16, 2020 North View Structural Steel
December 16, 2020 North View Structural Steel
September 16, 2020 Breaking Ground
September 16, 2020 Breaking Ground
September 16, 2020 Tim Speaking
September 16, 2020 Tim Speaking
September 16, 2020 Bankers Digging
September 16, 2020 Bankers Digging
September 16, 2020 Bankers
September 16, 2020 Bankers
September 2020 Subgrade for parking lot and building pad facing south.
September 2020 Subgrade for parking lot and building pad facing south.
September 2020 Excavation for Investors Court facing south.
September 2020 Excavation for Investors Court facing south.
September 2020 Evergreen Drive facing west. Gravel road bed installed.
September 2020 Evergreen Drive facing west. Gravel road bed installed.
October 2, 2020 Excavation for building footings at ICB lot facing east.
October 2, 2020 Excavation for building footings at ICB lot facing east.
October 2, 2020 Investors Court facing south - utilities view.
October 2, 2020 Investors Court facing south - utilities view.
October 2, 2020 Parking lot facing north. Fire hydrant installed.
October 2, 2020 Parking lot facing north. Fire hydrant installed.
October 9, 2020 Installing footing form and rebar/pouring footings.
October 9, 2020 Installing footing form and rebar/pouring footings.
October 9, 2020 Installing electrical conduit.
October 9, 2020 Installing electrical conduit.
October 9, 2020 Installing utilities and footing forms.
October 9, 2020 Installing utilities and footing forms.
October 9, 2020 Installing footing form and rebar/pouring footings.
October 9, 2020 Installing footing form and rebar/pouring footings.
October 27, 2020  Foundation on south side of building facing west.
October 27, 2020 Foundation on south side of building facing west.
October 27, 2020 Foundation footings on north side of building facing west.
October 27, 2020 Foundation footings on north side of building facing west.
October 27, 2020 Foundation for elevator shaft on north side of building.
October 27, 2020 Foundation for elevator shaft on north side of building.
November 11, 2020 Installation of electric conduit on south side of building.
November 11, 2020 Installation of electric conduit on south side of building.
November 11, 2020 Installation of footings for interior columns.
November 11, 2020 Installation of footings for interior columns.
November 11, 2020 Construction of elevator shaft, north side of building facing west.
November 11, 2020 Construction of elevator shaft, north side of building facing west.
November 18, 2020 Draining underground water to storm drain.
November 18, 2020 Draining underground water to storm drain.
November 18, 2020 Completed elevator shaft, north side of building.
November 18, 2020 Completed elevator shaft, north side of building.
November 18, 2020 Plumbing for first floor restrooms.
November 18, 2020 Plumbing for first floor restrooms.
March 29, 2021 Front Entrance
March 29, 2021 Front Entrance
March 29, 2021 Interior Office and Doorway
March 29, 2021 Interior Office and Doorway
March 29, 2021 Interior Studs on First Floor
March 29, 2021 Interior Studs on First Floor
March 29, 2021 Staircase
March 29, 2021 Staircase
February 17, 2021 Install of Zip Boards and Temp Windows
February 17, 2021 Install of Zip Boards and Temp Windows
February 17, 2021 Ground Thaw Heating Blanket
February 17, 2021 Ground Thaw Heating Blanket
February 17, 2021 Detail Work
February 17, 2021 Detail Work
February 17, 2021 Install of Zip Boards and Temp Windows East
February 17, 2021 Install of Zip Boards and Temp Windows East
January 26, 2021 South Frame and Skylight
January 26, 2021 South Frame and Skylight
January 26, 2021 West Frame
January 26, 2021 West Frame
January 26, 2021 Southeast Frame and Windows
January 26, 2021 Southeast Frame and Windows
December 16, 2020 South
December 16, 2020 South
December 16, 2020 West View Structural Steel
December 16, 2020 West View Structural Steel
December 16, 2020 North View Structural Steel
December 16, 2020 North View Structural Steel
September 16, 2020 Breaking Ground
September 16, 2020 Breaking Ground
September 16, 2020 Tim Speaking
September 16, 2020 Tim Speaking
September 16, 2020 Bankers Digging
September 16, 2020 Bankers Digging
September 16, 2020 Bankers
September 16, 2020 Bankers
September 2020 Subgrade for parking lot and building pad facing south.
September 2020 Subgrade for parking lot and building pad facing south.
September 2020 Excavation for Investors Court facing south.
September 2020 Excavation for Investors Court facing south.
September 2020 Evergreen Drive facing west. Gravel road bed installed.
September 2020 Evergreen Drive facing west. Gravel road bed installed.
October 2, 2020 Excavation for building footings at ICB lot facing east.
October 2, 2020 Excavation for building footings at ICB lot facing east.
October 2, 2020 Investors Court facing south - utilities view.
October 2, 2020 Investors Court facing south - utilities view.
October 2, 2020 Parking lot facing north. Fire hydrant installed.
October 2, 2020 Parking lot facing north. Fire hydrant installed.
October 9, 2020 Installing footing form and rebar/pouring footings.
October 9, 2020 Installing footing form and rebar/pouring footings.
October 9, 2020 Installing electrical conduit.
October 9, 2020 Installing electrical conduit.
October 9, 2020 Installing utilities and footing forms.
October 9, 2020 Installing utilities and footing forms.
October 9, 2020 Installing footing form and rebar/pouring footings.
October 9, 2020 Installing footing form and rebar/pouring footings.
October 27, 2020  Foundation on south side of building facing west.
October 27, 2020 Foundation on south side of building facing west.
October 27, 2020 Foundation footings on north side of building facing west.
October 27, 2020 Foundation footings on north side of building facing west.
October 27, 2020 Foundation for elevator shaft on north side of building.
October 27, 2020 Foundation for elevator shaft on north side of building.
November 11, 2020 Installation of electric conduit on south side of building.
November 11, 2020 Installation of electric conduit on south side of building.
November 11, 2020 Installation of footings for interior columns.
November 11, 2020 Installation of footings for interior columns.
November 11, 2020 Construction of elevator shaft, north side of building facing west.
November 11, 2020 Construction of elevator shaft, north side of building facing west.
November 18, 2020 Draining underground water to storm drain.
November 18, 2020 Draining underground water to storm drain.
November 18, 2020 Completed elevator shaft, north side of building.
November 18, 2020 Completed elevator shaft, north side of building.
November 18, 2020 Plumbing for first floor restrooms.
November 18, 2020 Plumbing for first floor restrooms.